Contract number: 12639519C0074
Contract Award date: 08/19/2019
Contract Amount: $331,000
Contracting officer: James Roloff
P: 612-336-3223
James.g.roloff@usda.gov
Contract number: 140P5319C0022
Contract Award date: July 30, 2019
Contract Amount: $167,099.00
Contracting officer: Mr. Ashley Warcewicz
P: 828-348-3417
Ashley_Warcewicz@nps.gov
Contract number: 140F0619C0015
Contract Award date: August 10, 2019
Contract Amount: $295,600.00
Contracting officer: Mr. Tim officer
P: (203)236-4791
tim_officer@fws.gov
Contract number: INP16PC00727
Contract Award date: 06/30/2017
Contract Amount: $141,263.00
Contracting officer: Ms. PHAEDRA FULLER
600 East Park Avenue, Port Angeles, WA 98362
(360) 461-1827
(360) 565-3009
Key Factors Contributing to the Success:
Persistency is one of the main characteristics of GDI staff. They don’t get tired and keep working till they reach the result.
Green dream was committed to supply the required specification at all costs. So it took every measure to search and find the best material available in the area and finally did achieve the goal.
The key element of success in this project was close and momentary control over all aspects including time, quality , probabilities, possible delays and … We did not fear to face the problems. Instead we had the determination to solve them.
Contract number: 4300544693
Contract Amount: $ 99,970.00
Contracting officer: Carol Durham
717-783-3309
cdurham@pa.gov
Callen Run Road
FOREST DISTRICT 08
Jefferson COUNTY, PA
The Commonwealth of Pennsylvania, Department of Conservation and Natural Resources, Clear Creek State Forest required services to deliver, paver-place and roll approximately 2,710 tons of DSA (driving surface aggregate), to Callen Run Road.
Key Factors Contributing to the Success:
Persistency is one of the main characteristics of GDI staff. They don’t get tired and keep working till they reach the result.
Green dream was committed to supply the required specification at all costs. So it took every measure to search and find the best material available in the area and finally did achieve the goal.
The key element of success in this project was close and momentary control over all aspects including time, quality , probabilities, possible delays and … We did not fear to face the problems. Instead we had the determination to solve them.
Contract number: P17PX03450
Contract Amount: $67,733.97
Contracting officer: Kathryn Logsdon
(217)391-3225
kathryn_logsdon@nps.gov
Buffalo National River
30 miles south of Harrison, Arkansas
The project consisted of grading 4 Roads in Buffalo National River Area, nearly 30 miles south of Harrison, AR. Culverts in these roads were also repaired. Finally, gravel was spread in all roads with a thickness of 3 Inches.
Key Factors Contributing to the Success:
Persistency is one of the main characteristics of GDI staff. They don’t get tired and keep working till they reach the result.
Green dream was committed to supply the required specification at all costs. So it took every measure to search and find the best material available in the area and finally did achieve the goal.
The key element of success in this project was close and momentary control over all aspects including time, quality , probabilities, possible delays and … We did not fear to face the problems. Instead we had the determination to solve them.
Contract number: P17PX02051
Contract Amount: $ 32,445.00
Contracting officer: Roselyn Sessoms
P: 718-354-4716
roselyn_sessoms@nps.gov
NPS, NER Supply MABO required rehabilitation of an asphalt tennis court at the Eleanor Roosevelt National Historic Site (ELRO) Hyde Park, NY. The tennis court area was about 4,000 square feet. Tennis court was constructed in 1950, the court had a 2-inch thick asphalt surface over a 6-inch compacted gravel base.
Key Factors Contributing to the Success:
Persistency is one of the main characteristics of GDI staff. They don’t get tired and keep working till they reach the result.
Green dream was committed to supply the required specification at all costs. So it took every measure to search and find the best material available in the area and finally did achieve the goal.
The key element of success in this project was close and momentary control over all aspects including time, quality , probabilities, possible delays and … We did not fear to face the problems. Instead we had the determination to solve them.
Contract number: 140P4518P0063
Contract Amount: $124,390.75
Technical POC: Jim Grant
718-815-4460
jim_grant@nps.gov
The Department of Interior required to purchase, delivery and leveling of 1955 tons of ¾ inch crushed stone base (Blue Stone) aggregate road material, delivered to Great Kills Park 3270 Hylan Blvd., Staten Island, NY. The contractor shall grade road surface and cut ditches prior to the delivery of crushed stone base for leveling.
The contractor also shall properly spread and level new gravel on .80 miles of roadways and parking areas providing for 6” of coverage +/- ½”. Gravel will be spread 20ft wide and .80 miles in length along roadway and cover entire parking areas. In addition to the above, the contractor shall also provide a crown along center of road surface to ensure proper drainage and run off. The existing gravel roads have experienced rutting, wash boarding and drainage issues due the extended use.
Green Dream was determined and committed from the first day to complete the project satisfactorily. So it took every measure to achieve that goal. Some of these measures included:
Key Factors Contributing to the Success:
Commitment is one of Green Dream’s basic principles. We pay the price for our promises.
Green Dream cares about the success of our clients’ projects and takes its job very seriously.
Green dream was committed to supply the highest quality material. That was achieved through a quality control program as well as determination to fulfill the exact requirement at all cost.
Every project has its own challenges that must be taken seriously and must be timely treated. This needs persistence and care from our side to understand every problem and seek a solution and to track the immediate actions needed.